Question 560
An end user reports the following condition: A company compares two equally rated 700 W PSUs and assumes both waste exactly the same amount of power at the wall. What should the support specialist recommend FIRST within the stated limits?
- Verify the PSU input voltage range and selector position before applying power.
- Compare verified efficiency ratings and realistic operating load rather than wattage alone.
- Use only cables explicitly approved for the exact modular PSU model.
- Verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
Explanation
Correct Answer
B:PSU efficiency describes conversion losses, while advertised capacity describes available DC output.
Incorrect Answers
A:Incorrect AC input settings can damage hardware or prevent operation; pSU efficiency describes conversion losses, while advertised capacity describes available DC output.
C:The device-end connectors may match while the PSU-end pinout differs dangerously; pSU efficiency describes conversion losses, while advertised capacity describes available DC output.
D:Different components may rely on different DC rails rather than a single voltage; pSU efficiency describes conversion losses, while advertised capacity describes available DC output.
Question 561
A help desk receives a support ticket with this evidence: A modular PSU replacement is installed using detachable power leads retained from a different manufacturer's unit. What is the MOST appropriate technician action?
- Verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
- Verify the PSU input voltage range and selector position before applying power.
- Compare verified efficiency ratings and realistic operating load rather than wattage alone.
- Use only cables explicitly approved for the exact modular PSU model.
Explanation
Correct Answer
D:The device-end connectors may match while the PSU-end pinout differs dangerously.
Incorrect Answers
A:Different components may rely on different DC rails rather than a single voltage; the device-end connectors may match while the PSU-end pinout differs dangerously.
B:Incorrect AC input settings can damage hardware or prevent operation; the device-end connectors may match while the PSU-end pinout differs dangerously.
C:PSU efficiency describes conversion losses, while advertised capacity describes available DC output; the device-end connectors may match while the PSU-end pinout differs dangerously.
Question 562
A field technician verifies the following customer equipment condition: A technician checks only a power supply's 12 V output while a legacy device requires a stable 5 V rail. Which response BEST addresses the actual cause or requirement?
- Verify the PSU input voltage range and selector position before applying power.
- Compare verified efficiency ratings and realistic operating load rather than wattage alone.
- Use only cables explicitly approved for the exact modular PSU model.
- Verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
Explanation
Correct Answer
D:Different components may rely on different DC rails rather than a single voltage.
Incorrect Answers
A:Verifying the PSU input voltage range and selector position would not verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
B:Comparing verified efficiency ratings and realistic operating load rather than wattage alone would not verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
C:Using only cables explicitly approved for the exact modular PSU model would not verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
Question 563
A support team must resolve TWO distinct issues at the same location, using approved non-destructive maintenance: A workstation is moved between electrical regions and its old PSU has a manual 115/230 volt selector set for the previous mains voltage. A company compares two equally rated 700 W PSUs and assumes both waste exactly the same amount of power at the wall. Which course of action addresses the stated issues?
- Verify the PSU input voltage range and selector position before applying power; compare verified efficiency ratings and realistic operating load rather than wattage alone.
- Use only cables explicitly approved for the exact modular PSU model; compare verified efficiency ratings and realistic operating load rather than wattage alone.
- Verify the PSU input voltage range and selector position before applying power; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
- Use only cables explicitly approved for the exact modular PSU model; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
Explanation
Correct Answer
A:For ticket (1), Incorrect AC input settings can damage hardware or prevent operation. For ticket (2), PSU efficiency describes conversion losses, while advertised capacity describes available DC output.
Incorrect Answers
B:For ticket 1, verify the PSU input voltage range and selector position before applying power. Incorrect AC input settings can damage hardware or prevent operation.
C:For ticket 2, compare verified efficiency ratings and realistic operating load rather than wattage alone. PSU efficiency describes conversion losses, while advertised capacity describes available DC output.
D:For ticket 1, verify the PSU input voltage range and selector position before applying power. Incorrect AC input settings can damage hardware or prevent operation. For ticket 2, compare verified efficiency ratings and realistic operating load rather than wattage alone. PSU efficiency describes conversion losses, while advertised capacity describes available DC output.
Question 564
A support team must resolve TWO distinct issues at the same location, using approved non-destructive maintenance: A workstation is moved between electrical regions and its old PSU has a manual 115/230 volt selector set for the previous mains voltage. A modular PSU replacement is installed using detachable power leads retained from a different manufacturer's unit. Which response best addresses these needs?
- Verify the PSU input voltage range and selector position before applying power; use only cables explicitly approved for the exact modular PSU model.
- Compare verified efficiency ratings and realistic operating load rather than wattage alone; use only cables explicitly approved for the exact modular PSU model.
- Verify the PSU input voltage range and selector position before applying power; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
- Compare verified efficiency ratings and realistic operating load rather than wattage alone; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
Explanation
Correct Answer
A:For ticket (1), Incorrect AC input settings can damage hardware or prevent operation. For ticket (2), The device-end connectors may match while the PSU-end pinout differs dangerously.
Incorrect Answers
B:For ticket 1, verify the PSU input voltage range and selector position before applying power. Incorrect AC input settings can damage hardware or prevent operation.
C:For ticket 2, use only cables explicitly approved for the exact modular PSU model. The device-end connectors may match while the PSU-end pinout differs dangerously.
D:For ticket 1, verify the PSU input voltage range and selector position before applying power. Incorrect AC input settings can damage hardware or prevent operation. For ticket 2, use only cables explicitly approved for the exact modular PSU model. The device-end connectors may match while the PSU-end pinout differs dangerously.
Question 565
A support team must resolve TWO distinct issues at the same location, using approved non-destructive maintenance: A company compares two equally rated 700 W PSUs and assumes both waste exactly the same amount of power at the wall. A technician checks only a power supply's 12 V output while a legacy device requires a stable 5 V rail. What is the most appropriate plan for this situation?
- Compare verified efficiency ratings and realistic operating load rather than wattage alone; use only cables explicitly approved for the exact modular PSU model.
- Verify the PSU input voltage range and selector position before applying power; use only cables explicitly approved for the exact modular PSU model.
- Compare verified efficiency ratings and realistic operating load rather than wattage alone; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
- Verify the PSU input voltage range and selector position before applying power; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
Explanation
Correct Answer
C:For ticket (1), PSU efficiency describes conversion losses, while advertised capacity describes available DC output. For ticket (2), Different components may rely on different DC rails rather than a single voltage.
Incorrect Answers
A:For ticket 2, verify the required 3.3 V, 5 V and 12 V rails using approved service measurements. Different components may rely on different DC rails rather than a single voltage.
B:For ticket 1, compare verified efficiency ratings and realistic operating load rather than wattage alone. PSU efficiency describes conversion losses, while advertised capacity describes available DC output. For ticket 2, verify the required 3.3 V, 5 V and 12 V rails using approved service measurements. Different components may rely on different DC rails rather than a single voltage.
D:For ticket 1, compare verified efficiency ratings and realistic operating load rather than wattage alone. PSU efficiency describes conversion losses, while advertised capacity describes available DC output.
Question 566
A support team must resolve TWO distinct issues at the same location, using approved non-destructive maintenance: A modular PSU replacement is installed using detachable power leads retained from a different manufacturer's unit. A technician checks only a power supply's 12 V output while a legacy device requires a stable 5 V rail. Which course of action addresses the stated issues?
- Use only cables explicitly approved for the exact modular PSU model; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
- Verify the PSU input voltage range and selector position before applying power; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
- Use only cables explicitly approved for the exact modular PSU model; compare verified efficiency ratings and realistic operating load rather than wattage alone.
- Verify the PSU input voltage range and selector position before applying power; compare verified efficiency ratings and realistic operating load rather than wattage alone.
Explanation
Correct Answer
A:For ticket (1), The device-end connectors may match while the PSU-end pinout differs dangerously. For ticket (2), Different components may rely on different DC rails rather than a single voltage.
Incorrect Answers
B:For ticket 1, use only cables explicitly approved for the exact modular PSU model. The device-end connectors may match while the PSU-end pinout differs dangerously.
C:For ticket 2, verify the required 3.3 V, 5 V and 12 V rails using approved service measurements. Different components may rely on different DC rails rather than a single voltage.
D:For ticket 1, use only cables explicitly approved for the exact modular PSU model. The device-end connectors may match while the PSU-end pinout differs dangerously. For ticket 2, verify the required 3.3 V, 5 V and 12 V rails using approved service measurements. Different components may rely on different DC rails rather than a single voltage.
Question 567
A service coordinator has THREE separate support tickets and needs the correct matching actions: A workstation is moved between electrical regions and its old PSU has a manual 115/230 volt selector set for the previous mains voltage. A company compares two equally rated 700 W PSUs and assumes both waste exactly the same amount of power at the wall. A modular PSU replacement is installed using detachable power leads retained from a different manufacturer's unit. Which response best addresses these needs?
- Verify the required 3.3 V, 5 V and 12 V rails using approved service measurements; compare verified efficiency ratings and realistic operating load rather than wattage alone; and use only cables explicitly approved for the exact modular PSU model.
- Verify the PSU input voltage range and selector position before applying power; verify the required 3.3 V, 5 V and 12 V rails using approved service measurements; and use only cables explicitly approved for the exact modular PSU model.
- Verify the PSU input voltage range and selector position before applying power; compare verified efficiency ratings and realistic operating load rather than wattage alone; and verify the required 3.3 V, 5 V and 12 V rails using approved service measurements.
- Verify the PSU input voltage range and selector position before applying power; compare verified efficiency ratings and realistic operating load rather than wattage alone; and use only cables explicitly approved for the exact modular PSU model.
Explanation
Correct Answer
D:For ticket (1), Incorrect AC input settings can damage hardware or prevent operation. For ticket (2), PSU efficiency describes conversion losses, while advertised capacity describes available DC output. For ticket (3), The device-end connectors may match while the PSU-end pinout differs dangerously.
Incorrect Answers
A:For ticket 1, verify the PSU input voltage range and selector position before applying power. Incorrect AC input settings can damage hardware or prevent operation.
B:For ticket 2, compare verified efficiency ratings and realistic operating load rather than wattage alone. PSU efficiency describes conversion losses, while advertised capacity describes available DC output.
C:For ticket 3, use only cables explicitly approved for the exact modular PSU model. The device-end connectors may match while the PSU-end pinout differs dangerously.
Question 568
An end user reports the following condition: A laptop requires a supported DDR5 SODIMM, and the technician attempts to fit a full-size DDR5 desktop DIMM. What should the support specialist recommend FIRST within the stated limits?
- Install the board-supported DDR generation rather than forcing newer memory into the slot.
- Reseat the supported DIMM evenly until both socket latches are correctly engaged.
- Confirm CPU and motherboard memory limits before ordering or installing an expansion set.
- Choose a DDR5 SODIMM supported by the system's board and memory controller.
Explanation
Correct Answer
D:Laptop and desktop memory modules have different lengths and connectors even within a DDR generation.
Incorrect Answers
A:DDR generations are not pin/key interchangeable and have different electrical requirements; laptop and desktop memory modules have different lengths and connectors even within a DDR generation.
B:A partly seated DIMM may interrupt memory initialization despite matching capacity; laptop and desktop memory modules have different lengths and connectors even within a DDR generation.
C:Physical slot count does not guarantee controller support for every module capacity; laptop and desktop memory modules have different lengths and connectors even within a DDR generation.
Question 569
A help desk receives a support ticket with this evidence: An older motherboard supports DDR4 memory, but a replacement DDR5 DIMM is purchased based solely on higher speed. What is the MOST appropriate technician action?
- Reseat the supported DIMM evenly until both socket latches are correctly engaged.
- Confirm CPU and motherboard memory limits before ordering or installing an expansion set.
- Choose a DDR5 SODIMM supported by the system's board and memory controller.
- Install the board-supported DDR generation rather than forcing newer memory into the slot.
Explanation
Correct Answer
D:DDR generations are not pin/key interchangeable and have different electrical requirements.
Incorrect Answers
A:Reseat the supported DIMM evenly until both socket latches are correctly engaged would not install the board-supported DDR generation rather than forcing newer memory into the slot.
B:Confirming CPU and motherboard memory limits would not install the board-supported DDR generation rather than forcing newer memory into the slot.
C:Choosing a DDR5 SODIMM supported by the system's board and memory controller would not install the board-supported DDR generation rather than forcing newer memory into the slot.
Question 570
A field technician verifies the following customer equipment condition: A desktop with two identical memory slots fails to recognize a new module inserted only partway into its latching socket. Which response BEST addresses the actual cause or requirement?
- Choose a DDR5 SODIMM supported by the system's board and memory controller.
- Install the board-supported DDR generation rather than forcing newer memory into the slot.
- Reseat the supported DIMM evenly until both socket latches are correctly engaged.
- Confirm CPU and motherboard memory limits before ordering or installing an expansion set.
Explanation
Correct Answer
C:A partly seated DIMM may interrupt memory initialization despite matching capacity.
Incorrect Answers
A:Laptop and desktop memory modules have different lengths and connectors even within a DDR generation; a partly seated DIMM may interrupt memory initialization despite matching capacity.
B:DDR generations are not pin/key interchangeable and have different electrical requirements; a partly seated DIMM may interrupt memory initialization despite matching capacity.
D:Physical slot count does not guarantee controller support for every module capacity; a partly seated DIMM may interrupt memory initialization despite matching capacity.
CompTIA A+ Certification Exam: Core 1 (220-1201) Practice Tests