Pass Your Juniper JN0-364 Exam Easy!

Juniper JN0-364 Exam Questions & Answers, Accurate & Verified By IT Experts

Instant Download, Free Fast Updates, 99.6% Pass Rate

JN0-364 Premium VCE File

Juniper JN0-364 Premium File

69 Questions & Answers

Last Update: Oct 24, 2026

$69.99

JN0-364 Bundle gives you unlimited access to "JN0-364" files. However, this does not replace the need for a .vce exam simulator. To download VCE exam simulator click here
JN0-364 Premium VCE File
Juniper JN0-364 Premium File

69 Questions & Answers

Last Update: Oct 24, 2026

$69.99

Juniper JN0-364 Exam Bundle gives you unlimited access to "JN0-364" files. However, this does not replace the need for a .vce exam simulator. To download your .vce exam simulator click here

Juniper JN0-364 Practice Test 80

Question 790

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: On a shared broadcast LAN, a router configured with OSPF priority zero is expected to become designated router but never wins election. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. Internal prefixes remain present, the designed default is learned, and external traffic follows that default without type-5 LSAs in the stub.
  2. Calculated path costs and the active next hop match the expected path, and failover still uses a valid alternate.
  3. An appropriate eligible router becomes DR or BDR after a controlled election and neighbor adjacency remains stable.
  4. Authenticated OSPF packet exchange resumes, the neighbor reaches Full and no authentication failures remain in logs.

Explanation

Correct Answer

C:

An appropriate eligible router becomes DR or BDR after a controlled election and neighbor adjacency remains stable. This tests the actual condition identified in the controlled acceptance rehearsal: On a shared broadcast LAN, a router configured with OSPF priority zero is expected to become designated router but never wins election. It is meaningful because OSPF priority zero makes a router ineligible to become designated or backup designated router on broadcast multiaccess links.

Incorrect Answers

A:

Internal prefixes remain present, the designed default is learned, and external traffic follows that default without type-5 LSAs in the stub. This measurement may prove the unrelated Stub area external LSA expectation condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: On a shared broadcast LAN, a router configured with OSPF priority zero is expected to become designated router but never wins election. A relevant acceptance result here is: An appropriate eligible router becomes DR or BDR after a controlled election and neighbor adjacency remains stable.

B:

Calculated path costs and the active next hop match the expected path, and failover still uses a valid alternate. This measurement may prove the unrelated OSPF metric path preference condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: On a shared broadcast LAN, a router configured with OSPF priority zero is expected to become designated router but never wins election. A relevant acceptance result here is: An appropriate eligible router becomes DR or BDR after a controlled election and neighbor adjacency remains stable.

D:

Authenticated OSPF packet exchange resumes, the neighbor reaches Full and no authentication failures remain in logs. This measurement may prove the unrelated OSPF authentication key mismatch condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: On a shared broadcast LAN, a router configured with OSPF priority zero is expected to become designated router but never wins election. A relevant acceptance result here is: An appropriate eligible router becomes DR or BDR after a controlled election and neighbor adjacency remains stable.

Question 791

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: PE-16 receives a route for a prefix that operations classify as martian, and policy reviews show that it should not be accepted as a normal reachable destination. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. The prefix is absent from permitted active forwarding while legitimate nearby routes remain reachable and logged rejection evidence matches policy.
  2. Several distinct test flows distribute across eligible next hops while each test flow remains ordered and correctly forwarded.
  3. Counters for the targeted match increment, only the intended traffic uses the alternate next hop, and unmatched traffic stays on its original path.
  4. With the downstream fault injected, the unsuitable backup route is withdrawn or de-preferred and valid traffic moves to the tested alternate.

Explanation

Correct Answer

A:

The prefix is absent from permitted active forwarding while legitimate nearby routes remain reachable and logged rejection evidence matches policy. This tests the actual condition identified in the controlled acceptance rehearsal: PE-16 receives a route for a prefix that operations classify as martian, and policy reviews show that it should not be accepted as a normal reachable destination. It is meaningful because Junos martian-address handling protects against inappropriate use of addresses that should not appear as normal routing destinations in that context.

Incorrect Answers

B:

Several distinct test flows distribute across eligible next hops while each test flow remains ordered and correctly forwarded. This measurement may prove the unrelated Per-flow hash expectation condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: PE-16 receives a route for a prefix that operations classify as martian, and policy reviews show that it should not be accepted as a normal reachable destination. A relevant acceptance result here is: The prefix is absent from permitted active forwarding while legitimate nearby routes remain reachable and logged rejection evidence matches policy.

C:

Counters for the targeted match increment, only the intended traffic uses the alternate next hop, and unmatched traffic stays on its original path. This measurement may prove the unrelated Filter-based forwarding classification condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: PE-16 receives a route for a prefix that operations classify as martian, and policy reviews show that it should not be accepted as a normal reachable destination. A relevant acceptance result here is: The prefix is absent from permitted active forwarding while legitimate nearby routes remain reachable and logged rejection evidence matches policy.

D:

With the downstream fault injected, the unsuitable backup route is withdrawn or de-preferred and valid traffic moves to the tested alternate. This measurement may prove the unrelated Static backup blackhole condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: PE-16 receives a route for a prefix that operations classify as martian, and policy reviews show that it should not be accepted as a normal reachable destination. A relevant acceptance result here is: The prefix is absent from permitted active forwarding while legitimate nearby routes remain reachable and logged rejection evidence matches policy.

Question 792

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: A newly connected CE sends traffic to a destination MAC not yet learned in its VLAN, and operators mistake the initial flooding for a routing loop. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. Captured handoff frames carry the agreed outer tag and correct inner VLAN values and pass only the authorized service.
  2. Initial flooding is VLAN-scoped, then subsequent frames to the learned MAC use the correct specific egress port.
  3. A same-tag packet from one customer cannot reach the other's service, while each customer's traffic traverses its own outer VLAN.
  4. Per-unit counters and a packet capture demonstrate each authorized VLAN tag reaches its mapped logical interface.

Explanation

Correct Answer

B:

Initial flooding is VLAN-scoped, then subsequent frames to the learned MAC use the correct specific egress port. This tests the actual condition identified in the controlled acceptance rehearsal: A newly connected CE sends traffic to a destination MAC not yet learned in its VLAN, and operators mistake the initial flooding for a routing loop. It is meaningful because A bridge floods unknown unicast within the broadcast domain until it learns the destination MAC's location from source traffic.

Incorrect Answers

A:

Captured handoff frames carry the agreed outer tag and correct inner VLAN values and pass only the authorized service. This measurement may prove the unrelated Q-in-Q outer tag mismatch condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A newly connected CE sends traffic to a destination MAC not yet learned in its VLAN, and operators mistake the initial flooding for a routing loop. A relevant acceptance result here is: Initial flooding is VLAN-scoped, then subsequent frames to the learned MAC use the correct specific egress port.

C:

A same-tag packet from one customer cannot reach the other's service, while each customer's traffic traverses its own outer VLAN. This measurement may prove the unrelated Provider VLAN customer isolation condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A newly connected CE sends traffic to a destination MAC not yet learned in its VLAN, and operators mistake the initial flooding for a routing loop. A relevant acceptance result here is: Initial flooding is VLAN-scoped, then subsequent frames to the learned MAC use the correct specific egress port.

D:

Per-unit counters and a packet capture demonstrate each authorized VLAN tag reaches its mapped logical interface. This measurement may prove the unrelated Flexible VLAN tagging logical units condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A newly connected CE sends traffic to a destination MAC not yet learned in its VLAN, and operators mistake the initial flooding for a routing loop. A relevant acceptance result here is: Initial flooding is VLAN-scoped, then subsequent frames to the learned MAC use the correct specific egress port.

Question 793

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: A newly restarted provider router is marked overloaded and therefore not used as transit despite an up adjacency; operations incorrectly call it an IP link failure. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. A usable default or intended inter-area reachability is present, and traced traffic exits through the designed L1/L2 router.
  2. Overload state matches the operational plan, and transit path calculations include the router only after successful readiness checks.
  3. LSPs from the peer remain current across normal refresh cycles and SPF paths do not disappear unexpectedly.
  4. IS-IS Hello exchanges appear and the expected level adjacency establishes while IPv4 traffic still functions.

Explanation

Correct Answer

B:

Overload state matches the operational plan, and transit path calculations include the router only after successful readiness checks. This tests the actual condition identified in the controlled acceptance rehearsal: A newly restarted provider router is marked overloaded and therefore not used as transit despite an up adjacency; operations incorrectly call it an IP link failure. It is meaningful because An IS-IS node in overload advertises that it should not be used for transit SPF paths even while adjacencies can be up.

Incorrect Answers

A:

A usable default or intended inter-area reachability is present, and traced traffic exits through the designed L1/L2 router. This measurement may prove the unrelated IS-IS Level 1 exit default condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A newly restarted provider router is marked overloaded and therefore not used as transit despite an up adjacency; operations incorrectly call it an IP link failure. A relevant acceptance result here is: Overload state matches the operational plan, and transit path calculations include the router only after successful readiness checks.

C:

LSPs from the peer remain current across normal refresh cycles and SPF paths do not disappear unexpectedly. This measurement may prove the unrelated IS-IS LSP lifetime anomaly condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A newly restarted provider router is marked overloaded and therefore not used as transit despite an up adjacency; operations incorrectly call it an IP link failure. A relevant acceptance result here is: Overload state matches the operational plan, and transit path calculations include the router only after successful readiness checks.

D:

IS-IS Hello exchanges appear and the expected level adjacency establishes while IPv4 traffic still functions. This measurement may prove the unrelated IS-IS ISO family missing condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A newly restarted provider router is marked overloaded and therefore not used as transit despite an up adjacency; operations incorrectly call it an IP link failure. A relevant acceptance result here is: Overload state matches the operational plan, and transit path calculations include the router only after successful readiness checks.

Question 794

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: An engineer sees a route in the routing protocol database and assumes data packets must use it, but the route is hidden or inactive relative to an alternative. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. The chosen route becomes active and the forwarding table points to its resolved next hop; an end-to-end trace follows that path.
  2. The selected active prefix shows the intended protocol, route preference, and forwarding next hop both before and after a controlled failover.
  3. The forwarding table shows both expected next hops and representative flows use the authorized paths without loop or asymmetry problems.
  4. The generated default becomes active with the expected next hop only when the qualifying contributor exists.

Explanation

Correct Answer

A:

The chosen route becomes active and the forwarding table points to its resolved next hop; an end-to-end trace follows that path. This tests the actual condition identified in the controlled acceptance rehearsal: An engineer sees a route in the routing protocol database and assumes data packets must use it, but the route is hidden or inactive relative to an alternative. It is meaningful because Junos can retain candidate and inactive routes in routing tables while forwarding uses only the selected active route installed in the forwarding information base.

Incorrect Answers

B:

The selected active prefix shows the intended protocol, route preference, and forwarding next hop both before and after a controlled failover. This measurement may prove the unrelated Administrative preference overrides static condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: An engineer sees a route in the routing protocol database and assumes data packets must use it, but the route is hidden or inactive relative to an alternative. A relevant acceptance result here is: The chosen route becomes active and the forwarding table points to its resolved next hop; an end-to-end trace follows that path.

C:

The forwarding table shows both expected next hops and representative flows use the authorized paths without loop or asymmetry problems. This measurement may prove the unrelated Equal-cost multipath eligibility condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: An engineer sees a route in the routing protocol database and assumes data packets must use it, but the route is hidden or inactive relative to an alternative. A relevant acceptance result here is: The chosen route becomes active and the forwarding table points to its resolved next hop; an end-to-end trace follows that path.

D:

The generated default becomes active with the expected next hop only when the qualifying contributor exists. This measurement may prove the unrelated Generated default route prerequisite condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: An engineer sees a route in the routing protocol database and assumes data packets must use it, but the route is hidden or inactive relative to an alternative. A relevant acceptance result here is: The chosen route becomes active and the forwarding table points to its resolved next hop; an end-to-end trace follows that path.

Question 795

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: IS-IS neighbors are up for IPv4, but IPv6 routes do not appear because the IPv6 reachability information is not advertised in supported IS-IS TLVs. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. An IPv6 trace crosses the intended tunnel, while outer IPv4 packets reach the peer endpoints and encapsulation counters increment.
  2. The relevant IPv6 reachability TLVs are present and remote IPv6 prefixes become active in inet6.0.
  3. Large IPv6 application transfers succeed and Packet Too Big messages reach the source when necessary.
  4. The OSPFv3 neighbor reaches the expected state and learned IPv6 prefixes appear in inet6.0.

Explanation

Correct Answer

B:

The relevant IPv6 reachability TLVs are present and remote IPv6 prefixes become active in inet6.0. This tests the actual condition identified in the controlled acceptance rehearsal: IS-IS neighbors are up for IPv4, but IPv6 routes do not appear because the IPv6 reachability information is not advertised in supported IS-IS TLVs. It is meaningful because IS-IS uses suitable TLVs for IPv6 prefix reachability; a healthy IPv4 adjacency does not alone supply IPv6 routing information.

Incorrect Answers

A:

An IPv6 trace crosses the intended tunnel, while outer IPv4 packets reach the peer endpoints and encapsulation counters increment. This measurement may prove the unrelated IPv6 over IPv4 transit tunnel condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: IS-IS neighbors are up for IPv4, but IPv6 routes do not appear because the IPv6 reachability information is not advertised in supported IS-IS TLVs. A relevant acceptance result here is: The relevant IPv6 reachability TLVs are present and remote IPv6 prefixes become active in inet6.0.

C:

Large IPv6 application transfers succeed and Packet Too Big messages reach the source when necessary. This measurement may prove the unrelated ICMPv6 packet-too-big handling condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: IS-IS neighbors are up for IPv4, but IPv6 routes do not appear because the IPv6 reachability information is not advertised in supported IS-IS TLVs. A relevant acceptance result here is: The relevant IPv6 reachability TLVs are present and remote IPv6 prefixes become active in inet6.0.

D:

The OSPFv3 neighbor reaches the expected state and learned IPv6 prefixes appear in inet6.0. This measurement may prove the unrelated OSPFv3 neighbor uses link-local condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: IS-IS neighbors are up for IPv4, but IPv6 routes do not appear because the IPv6 reachability information is not advertised in supported IS-IS TLVs. A relevant acceptance result here is: The relevant IPv6 reachability TLVs are present and remote IPv6 prefixes become active in inet6.0.

Question 796

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: An IBGP session targets a remote loopback but the local router sources traffic from a physical interface not permitted by its peer, so the BGP connection fails. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. The rejected prefix does not appear as an eligible route while approved advertised prefixes remain available.
  2. A route detail comparison shows the relevant AS-path difference and chosen path conforms to approved policy.
  3. The peer exchanges approved IPv6 routes and their next hops resolve into inet6.0 without exposing unintended prefixes.
  4. The session establishes using the intended loopback source and destination and stays up after a physical link fails.

Explanation

Correct Answer

D:

The session establishes using the intended loopback source and destination and stays up after a physical link fails. This tests the actual condition identified in the controlled acceptance rehearsal: An IBGP session targets a remote loopback but the local router sources traffic from a physical interface not permitted by its peer, so the BGP connection fails. It is meaningful because IBGP loopback peering depends on correct local address selection and recursive reachability to the configured peer endpoint.

Incorrect Answers

A:

The rejected prefix does not appear as an eligible route while approved advertised prefixes remain available. This measurement may prove the unrelated BGP import policy leak condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: An IBGP session targets a remote loopback but the local router sources traffic from a physical interface not permitted by its peer, so the BGP connection fails. A relevant acceptance result here is: The session establishes using the intended loopback source and destination and stays up after a physical link fails.

B:

A route detail comparison shows the relevant AS-path difference and chosen path conforms to approved policy. This measurement may prove the unrelated BGP AS-path comparison condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: An IBGP session targets a remote loopback but the local router sources traffic from a physical interface not permitted by its peer, so the BGP connection fails. A relevant acceptance result here is: The session establishes using the intended loopback source and destination and stays up after a physical link fails.

C:

The peer exchanges approved IPv6 routes and their next hops resolve into inet6.0 without exposing unintended prefixes. This measurement may prove the unrelated BGP IPv6 family inactive condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: An IBGP session targets a remote loopback but the local router sources traffic from a physical interface not permitted by its peer, so the BGP connection fails. A relevant acceptance result here is: The session establishes using the intended loopback source and destination and stays up after a physical link fails.

Question 797

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: A router learns a BGP route from one IBGP peer but does not advertise it to a second IBGP peer, despite both sessions being Established. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. A route detail comparison shows the relevant AS-path difference and chosen path conforms to approved policy.
  2. The intended peer receives the route through permitted reflection or a full-mesh session, and next-hop reachability is correct.
  3. Both peers establish an expected eBGP session and the remote AS displayed in session state matches the design.
  4. The best path matches the documented MED comparison scope and the selected inbound preference is confirmed with peer attributes.

Explanation

Correct Answer

B:

The intended peer receives the route through permitted reflection or a full-mesh session, and next-hop reachability is correct. This tests the actual condition identified in the controlled acceptance rehearsal: A router learns a BGP route from one IBGP peer but does not advertise it to a second IBGP peer, despite both sessions being Established. It is meaningful because Standard IBGP propagation rules do not relay an IBGP-learned route to another IBGP peer without a suitable route-reflection or confederation design.

Incorrect Answers

A:

A route detail comparison shows the relevant AS-path difference and chosen path conforms to approved policy. This measurement may prove the unrelated BGP AS-path comparison condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A router learns a BGP route from one IBGP peer but does not advertise it to a second IBGP peer, despite both sessions being Established. A relevant acceptance result here is: The intended peer receives the route through permitted reflection or a full-mesh session, and next-hop reachability is correct.

C:

Both peers establish an expected eBGP session and the remote AS displayed in session state matches the design. This measurement may prove the unrelated BGP peer autonomous system mismatch condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A router learns a BGP route from one IBGP peer but does not advertise it to a second IBGP peer, despite both sessions being Established. A relevant acceptance result here is: The intended peer receives the route through permitted reflection or a full-mesh session, and next-hop reachability is correct.

D:

The best path matches the documented MED comparison scope and the selected inbound preference is confirmed with peer attributes. This measurement may prove the unrelated BGP MED comparison scope condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A router learns a BGP route from one IBGP peer but does not advertise it to a second IBGP peer, despite both sessions being Established. A relevant acceptance result here is: The intended peer receives the route through permitted reflection or a full-mesh session, and next-hop reachability is correct.

Question 798

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: Small IPv6 pings succeed over a provider path but larger sessions stall because an intermediate filter blocks Packet Too Big messages needed by IPv6 Path MTU Discovery. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. An IPv6 trace crosses the intended tunnel, while outer IPv4 packets reach the peer endpoints and encapsulation counters increment.
  2. Large IPv6 application transfers succeed and Packet Too Big messages reach the source when necessary.
  3. The IPv6 route is active in inet6.0 with the correct interface-scoped next hop and test traffic reaches the peer.
  4. Approved IPv6 prefixes are received, installed and reachable with the correct inet6.0 next-hop resolution.

Explanation

Correct Answer

B:

Large IPv6 application transfers succeed and Packet Too Big messages reach the source when necessary. This tests the actual condition identified in the controlled acceptance rehearsal: Small IPv6 pings succeed over a provider path but larger sessions stall because an intermediate filter blocks Packet Too Big messages needed by IPv6 Path MTU Discovery. It is meaningful because IPv6 routers do not fragment transit packets; working Path MTU Discovery relies on ICMPv6 errors when packets exceed a path MTU.

Incorrect Answers

A:

An IPv6 trace crosses the intended tunnel, while outer IPv4 packets reach the peer endpoints and encapsulation counters increment. This measurement may prove the unrelated IPv6 over IPv4 transit tunnel condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: Small IPv6 pings succeed over a provider path but larger sessions stall because an intermediate filter blocks Packet Too Big messages needed by IPv6 Path MTU Discovery. A relevant acceptance result here is: Large IPv6 application transfers succeed and Packet Too Big messages reach the source when necessary.

C:

The IPv6 route is active in inet6.0 with the correct interface-scoped next hop and test traffic reaches the peer. This measurement may prove the unrelated IPv6 static link-local next hop condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: Small IPv6 pings succeed over a provider path but larger sessions stall because an intermediate filter blocks Packet Too Big messages needed by IPv6 Path MTU Discovery. A relevant acceptance result here is: Large IPv6 application transfers succeed and Packet Too Big messages reach the source when necessary.

D:

Approved IPv6 prefixes are received, installed and reachable with the correct inet6.0 next-hop resolution. This measurement may prove the unrelated IPv6 BGP NLRI family omitted condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: Small IPv6 pings succeed over a provider path but larger sessions stall because an intermediate filter blocks Packet Too Big messages needed by IPv6 Path MTU Discovery. A relevant acceptance result here is: Large IPv6 application transfers succeed and Packet Too Big messages reach the source when necessary.

Question 799

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: A customer's MAC alternates rapidly between two provider ports after a redundant CE was cabled incorrectly, causing intermittent service loss. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. Initial flooding is VLAN-scoped, then subsequent frames to the learned MAC use the correct specific egress port.
  2. The MAC stabilizes on its expected port or approved redundancy construct and packet loss disappears.
  3. The customer MAC and VLAN appear in the correct virtual-switch instance with no leakage into default bridging context.
  4. VLAN 340 MAC learning and tagged traffic are observed on the intended trunk without accidentally carrying other customer VLANs.

Explanation

Correct Answer

B:

The MAC stabilizes on its expected port or approved redundancy construct and packet loss disappears. This tests the actual condition identified in the controlled acceptance rehearsal: A customer's MAC alternates rapidly between two provider ports after a redundant CE was cabled incorrectly, causing intermittent service loss. It is meaningful because Layer 2 learning continually updates a MAC address's egress port; uncontrolled MAC moves can indicate bridging loops or unstable attachments.

Incorrect Answers

A:

Initial flooding is VLAN-scoped, then subsequent frames to the learned MAC use the correct specific egress port. This measurement may prove the unrelated Unknown unicast flooding behavior condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A customer's MAC alternates rapidly between two provider ports after a redundant CE was cabled incorrectly, causing intermittent service loss. A relevant acceptance result here is: The MAC stabilizes on its expected port or approved redundancy construct and packet loss disappears.

C:

The customer MAC and VLAN appear in the correct virtual-switch instance with no leakage into default bridging context. This measurement may prove the unrelated Virtual switch instance membership condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A customer's MAC alternates rapidly between two provider ports after a redundant CE was cabled incorrectly, causing intermittent service loss. A relevant acceptance result here is: The MAC stabilizes on its expected port or approved redundancy construct and packet loss disappears.

D:

VLAN 340 MAC learning and tagged traffic are observed on the intended trunk without accidentally carrying other customer VLANs. This measurement may prove the unrelated Trunk allowed VLAN omission condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A customer's MAC alternates rapidly between two provider ports after a redundant CE was cabled incorrectly, causing intermittent service loss. A relevant acceptance result here is: The MAC stabilizes on its expected port or approved redundancy construct and packet loss disappears.

Question 800

During a controlled acceptance rehearsal of the same defect on a separate test network, engineers observe: A filter-based forwarding policy routes all service traffic into a measurement instance because a broad first term accepts packets before the narrower intended match. After the appropriate change, which observation would most directly establish that this particular issue was corrected?

  1. The forwarding table shows both expected next hops and representative flows use the authorized paths without loop or asymmetry problems.
  2. Several distinct test flows distribute across eligible next hops while each test flow remains ordered and correctly forwarded.
  3. Matched and unmatched packet samples increment their intended counters and resolve to the expected respective routing tables.
  4. With the downstream fault injected, the unsuitable backup route is withdrawn or de-preferred and valid traffic moves to the tested alternate.

Explanation

Correct Answer

C:

Matched and unmatched packet samples increment their intended counters and resolve to the expected respective routing tables. This tests the actual condition identified in the controlled acceptance rehearsal: A filter-based forwarding policy routes all service traffic into a measurement instance because a broad first term accepts packets before the narrower intended match. It is meaningful because Ordered firewall-filter terms apply the first matching action; overbroad early terms can shadow later selective forwarding rules.

Incorrect Answers

A:

The forwarding table shows both expected next hops and representative flows use the authorized paths without loop or asymmetry problems. This measurement may prove the unrelated Equal-cost multipath eligibility condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A filter-based forwarding policy routes all service traffic into a measurement instance because a broad first term accepts packets before the narrower intended match. A relevant acceptance result here is: Matched and unmatched packet samples increment their intended counters and resolve to the expected respective routing tables.

B:

Several distinct test flows distribute across eligible next hops while each test flow remains ordered and correctly forwarded. This measurement may prove the unrelated Per-flow hash expectation condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A filter-based forwarding policy routes all service traffic into a measurement instance because a broad first term accepts packets before the narrower intended match. A relevant acceptance result here is: Matched and unmatched packet samples increment their intended counters and resolve to the expected respective routing tables.

D:

With the downstream fault injected, the unsuitable backup route is withdrawn or de-preferred and valid traffic moves to the tested alternate. This measurement may prove the unrelated Static backup blackhole condition, but it does not demonstrate that the current controlled acceptance rehearsal was resolved. The specific observed fault is: A filter-based forwarding policy routes all service traffic into a measurement instance because a broad first term accepts packets before the narrower intended match. A relevant acceptance result here is: Matched and unmatched packet samples increment their intended counters and resolve to the expected respective routing tables.


Service Provider Routing and Switching, Specialist (JNCIS-SP) (JN0-364) Practice Tests

Purchase Individually

JN0-364 Premium File

Premium File
JN0-364 Premium File
69 Q&A
$76.99$69.99

Site Search:

 

VISA, MasterCard, AmericanExpress, UnionPay

SPECIAL OFFER: GET 10% OFF

ExamCollection Premium

ExamCollection Premium Files

Pass your Exam with ExamCollection's PREMIUM files!

  • ExamCollection Certified Safe Files
  • Guaranteed to have ACTUAL Exam Questions
  • Up-to-Date Exam Study Material - Verified by Experts
  • Instant Downloads
Enter Your Email Address to Receive Your 10% Off Discount Code
A Confirmation Link will be sent to this email address to verify your login
We value your privacy. We will not rent or sell your email address

SPECIAL OFFER: GET 10% OFF

Use Discount Code:

MIN10OFF

A confirmation link was sent to your e-mail.
Please check your mailbox for a message from support@examcollection.com and follow the directions.

Next

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your e-mail address below to get started with our interactive software demo of your free trial.

Free Demo Limits: In the demo version you will be able to access only first 5 questions from exam.