Question 220
During a network-operations overnight incident, the engineering team observes that a point-to-point IS-IS link comes up but the peers have inconsistent link-state databases. Use the observed protocol behavior and avoid unrelated configuration changes. After the findings are confirmed, which targeted change or operational response is most appropriate?
- Enable the intended compatible Level-2 adjacency on the inter-area link
- Accept the valid re-election and repair only unintended priority configuration
- Clear the overload condition only after the node's control-plane database is ready
- Restore LSP exchange and retransmission rather than adjusting unrelated BGP filters
Explanation
Correct Answer
D:Restore LSP exchange and retransmission rather than adjusting unrelated BGP filters. The proposed correction addresses the identified cause: IS-IS CSNP and PSNP messages coordinate completeness and repair missing LSP information. Confirm the associated evidence afterward.
Incorrect Answers
A:Enable the intended compatible Level-2 adjacency on the inter-area link. This is associated with is-is level-2 adjacency between areas, where two IS-IS routers in different areas need backbone reachability but Level-1 formation fails. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The correction should repair this specific failing component.
B:Accept the valid re-election and repair only unintended priority configuration. This is associated with is-is dis election on lan, where a higher-priority IS-IS router is introduced and the pseudonode role changes. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The correction should repair this specific failing component.
C:Clear the overload condition only after the node's control-plane database is ready. This is associated with is-is overload-bit transit suppression, where a restarting IS-IS router has reachability to itself but should not be used as transit temporarily. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The correction should repair this specific failing component.
Question 221
During a university backbone acceptance test, the engineering team observes that a point-to-point IS-IS link comes up but the peers have inconsistent link-state databases. Use the observed protocol behavior and avoid unrelated configuration changes. Which operational practice would best prevent recurrence or avoid misinterpreting this behavior?
- Verify IS-IS LSDB synchronization as part of point-to-point adjacency acceptance
- Audit device TLV support when extending routing protocol features
- Monitor LSP churn and SPF frequency after topology modifications
- Verify area exit reachability when deploying Level-1 domains
Explanation
Correct Answer
A:Verify IS-IS LSDB synchronization as part of point-to-point adjacency acceptance. The proposed safeguard targets recurrence of IS-IS CSNP and PSNP synchronization by checking the dependency described in the incident.
Incorrect Answers
B:Audit device TLV support when extending routing protocol features. This is associated with is-is tlv extensibility, where an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The preventive control should monitor the relevant dependency.
C:Monitor LSP churn and SPF frequency after topology modifications. This is associated with is-is spf and lsdb changes, where a link-state change causes an IS-IS router to recalculate selected paths. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The preventive control should monitor the relevant dependency.
D:Verify area exit reachability when deploying Level-1 domains. This is associated with is-is level-1 area boundary, where a Level-1-only router cannot learn every remote-area prefix directly. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The preventive control should monitor the relevant dependency.
Question 222
During an enterprise security change review, the engineering team observes that a point-to-point IS-IS link comes up but the peers have inconsistent link-state databases. Use the observed protocol behavior and avoid unrelated configuration changes. Which two-step troubleshooting approach should the engineer use before making changes?
- First compare their NET area addresses and supported levels; then correlate it with whether the two NET area portions differ even though transport interfaces are reachable
- First inspect CSNP summaries and PSNP requests across the adjacency; then correlate it with whether a missing LSP is requested via PSNP after comparison with the peer's CSNP
- First inspect whether the facing interfaces can form a Level-2 adjacency; then correlate it with whether the devices are configured Level-1-only across different area identifiers
- First inspect LAN DIS priority and pseudonode LSP information; then correlate it with whether the new higher-priority candidate becomes DIS and originates the LAN pseudonode LSP
Explanation
Correct Answer
B:First inspect CSNP summaries and PSNP requests across the adjacency; then correlate it with whether a missing LSP is requested via PSNP after comparison with the peer's CSNP. This sequence isolates IS-IS CSNP and PSNP synchronization before production edits. It combines a targeted check with its specific confirming evidence.
Incorrect Answers
A:First compare their NET area addresses and supported levels; then correlate it with whether the two NET area portions differ even though transport interfaces are reachable. This is associated with is-is net area compatibility, where directly connected IS-IS Level-1 peers do not establish an adjacency after NET changes. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The investigation sequence should locate the fault before edits.
C:First inspect whether the facing interfaces can form a Level-2 adjacency; then correlate it with whether the devices are configured Level-1-only across different area identifiers. This is associated with is-is level-2 adjacency between areas, where two IS-IS routers in different areas need backbone reachability but Level-1 formation fails. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The investigation sequence should locate the fault before edits.
D:First inspect LAN DIS priority and pseudonode LSP information; then correlate it with whether the new higher-priority candidate becomes DIS and originates the LAN pseudonode LSP. This is associated with is-is dis election on lan, where a higher-priority IS-IS router is introduced and the pseudonode role changes. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The investigation sequence should locate the fault before edits.
Question 223
During a campus distribution change, the engineering team observes that a point-to-point IS-IS link comes up but the peers have inconsistent link-state databases. Use the observed protocol behavior and avoid unrelated configuration changes. Which acceptance result demonstrates the intended correction actually worked?
- Verify that the node's LSP carries the overload indication while its direct destinations remain reachable and that the reported service symptom has cleared after the correction
- Verify that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional and that the reported service symptom has cleared after the correction
- Verify that a missing LSP is requested via PSNP after comparison with the peer's CSNP and that the reported service symptom has cleared after the correction
- Verify that a newly flooded LSP precedes a changed shortest-path tree and route selection and that the reported service symptom has cleared after the correction
Explanation
Correct Answer
C:Verify that a missing LSP is requested via PSNP after comparison with the peer's CSNP and that the reported service symptom has cleared after the correction. Acceptance should show the corrected mechanism is working and the original failure no longer occurs; evidence is a missing LSP is requested via PSNP after comparison with the peer's CSNP.
Incorrect Answers
A:Verify that the node's LSP carries the overload indication while its direct destinations remain reachable and that the reported service symptom has cleared after the correction. This is associated with is-is overload-bit transit suppression, where a restarting IS-IS router has reachability to itself but should not be used as transit temporarily. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. Post-change acceptance must demonstrate restored service.
B:Verify that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional and that the reported service symptom has cleared after the correction. This is associated with is-is tlv extensibility, where an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. Post-change acceptance must demonstrate restored service.
D:Verify that a newly flooded LSP precedes a changed shortest-path tree and route selection and that the reported service symptom has cleared after the correction. This is associated with is-is spf and lsdb changes, where a link-state change causes an IS-IS router to recalculate selected paths. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. Post-change acceptance must demonstrate restored service.
Question 224
During an enterprise data center failover test, the engineering team observes that a point-to-point IS-IS link comes up but the peers have inconsistent link-state databases. Use the observed protocol behavior and avoid unrelated configuration changes. Which analysis best describes what will continue to happen if the current behavior is left unchanged?
- The original symptom can persist because IS-IS Level-1 maintains intra-area topology while Level-2 provides inter-area backbone connectivity; changing unrelated settings will not resolve that dependency
- The original symptom can persist because IS-IS Level-1 neighbors must share compatible area addressing to establish same-area adjacency; changing unrelated settings will not resolve that dependency
- The original symptom can persist because IS-IS Level-2 adjacency can connect routers across area boundaries without matching Level-1 area addresses; changing unrelated settings will not resolve that dependency
- The original symptom can persist because IS-IS CSNP and PSNP messages coordinate completeness and repair missing LSP information; changing unrelated settings will not resolve that dependency
Explanation
Correct Answer
D:The original symptom can persist because IS-IS CSNP and PSNP messages coordinate completeness and repair missing LSP information; changing unrelated settings will not resolve that dependency. This is a realistic failure risk for IS-IS CSNP and PSNP synchronization, because it connects the unchanged cause to the continuing incident.
Incorrect Answers
A:The original symptom can persist because IS-IS Level-1 maintains intra-area topology while Level-2 provides inter-area backbone connectivity; changing unrelated settings will not resolve that dependency. This is associated with is-is level-1 area boundary, where a Level-1-only router cannot learn every remote-area prefix directly. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. Risk analysis must connect the root mechanism to service impact.
B:The original symptom can persist because IS-IS Level-1 neighbors must share compatible area addressing to establish same-area adjacency; changing unrelated settings will not resolve that dependency. This is associated with is-is net area compatibility, where directly connected IS-IS Level-1 peers do not establish an adjacency after NET changes. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. Risk analysis must connect the root mechanism to service impact.
C:The original symptom can persist because IS-IS Level-2 adjacency can connect routers across area boundaries without matching Level-1 area addresses; changing unrelated settings will not resolve that dependency. This is associated with is-is level-2 adjacency between areas, where two IS-IS routers in different areas need backbone reachability but Level-1 formation fails. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. Risk analysis must connect the root mechanism to service impact.
Question 225
During a warehouse connectivity rollout, the engineering team observes that a point-to-point IS-IS link comes up but the peers have inconsistent link-state databases. Use the observed protocol behavior and avoid unrelated configuration changes. What precise change-handoff requirement should be recorded for the operations team?
- Document restore LSP exchange and retransmission rather than adjusting unrelated BGP filters, plus a recurrence check to verify IS-IS LSDB synchronization as part of point-to-point adjacency acceptance
- Document accept the valid re-election and repair only unintended priority configuration, plus a recurrence check to plan DIS priority and LSP churn during backbone maintenance
- Document clear the overload condition only after the node's control-plane database is ready, plus a recurrence check to use overload-on-startup and monitoring to protect converging routers
- Document enable the necessary IPv6 IS-IS capability and relevant reachability TLVs, plus a recurrence check to audit device TLV support when extending routing protocol features
Explanation
Correct Answer
A:Document restore LSP exchange and retransmission rather than adjusting unrelated BGP filters, plus a recurrence check to verify IS-IS LSDB synchronization as part of point-to-point adjacency acceptance. The handoff names both the immediate repair and a preventive verification specific to IS-IS CSNP and PSNP synchronization; it allows repeatable operations review.
Incorrect Answers
B:Document accept the valid re-election and repair only unintended priority configuration, plus a recurrence check to plan DIS priority and LSP churn during backbone maintenance. This is associated with is-is dis election on lan, where a higher-priority IS-IS router is introduced and the pseudonode role changes. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The operations handoff needs the exact corrective and preventive scope.
C:Document clear the overload condition only after the node's control-plane database is ready, plus a recurrence check to use overload-on-startup and monitoring to protect converging routers. This is associated with is-is overload-bit transit suppression, where a restarting IS-IS router has reachability to itself but should not be used as transit temporarily. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The operations handoff needs the exact corrective and preventive scope.
D:Document enable the necessary IPv6 IS-IS capability and relevant reachability TLVs, plus a recurrence check to audit device TLV support when extending routing protocol features. This is associated with is-is tlv extensibility, where an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. Here the report is about is-is csnp and psnp synchronization; the differentiator is that a missing LSP is requested via PSNP after comparison with the peer's CSNP. The operations handoff needs the exact corrective and preventive scope.
Question 226
During an enterprise security change review, the engineering team observes that an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. Use the observed protocol behavior and avoid unrelated configuration changes. What focused first verification most directly isolates the fault in this scenario?
- Inspect its IS-IS level and area membership and nearest Level-1-2 attachment
- Inspect supported IS-IS TLVs and IPv6 capability advertisements
- Compare their NET area addresses and supported levels
- Inspect whether the facing interfaces can form a Level-2 adjacency
Explanation
Correct Answer
B:Inspect supported IS-IS TLVs and IPv6 capability advertisements. This check targets IS-IS TLV extensibility: new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. It tests the suspected dependency rather than an unrelated service.
Incorrect Answers
A:Inspect its IS-IS level and area membership and nearest Level-1-2 attachment. This is associated with is-is level-1 area boundary, where a Level-1-only router cannot learn every remote-area prefix directly. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The first verification must isolate this specific dependency.
C:Compare their NET area addresses and supported levels. This is associated with is-is net area compatibility, where directly connected IS-IS Level-1 peers do not establish an adjacency after NET changes. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The first verification must isolate this specific dependency.
D:Inspect whether the facing interfaces can form a Level-2 adjacency. This is associated with is-is level-2 adjacency between areas, where two IS-IS routers in different areas need backbone reachability but Level-1 formation fails. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The first verification must isolate this specific dependency.
Question 227
During a campus distribution change, the engineering team observes that an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. Use the observed protocol behavior and avoid unrelated configuration changes. Which protocol or control-plane mechanism best explains the observed behavior?
- IS-IS LAN DIS election is preemptive, unlike OSPF's non-preemptive DR election
- An IS-IS overload bit signals other routers to avoid using that node as transit during SPF
- IS-IS extends protocol information through TLVs, including support for additional network-layer reachability
- IS-IS CSNP and PSNP messages coordinate completeness and repair missing LSP information
Explanation
Correct Answer
C:IS-IS extends protocol information through TLVs, including support for additional network-layer reachability. This mechanism accounts for an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. The decisive condition to verify is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional.
Incorrect Answers
A:IS-IS LAN DIS election is preemptive, unlike OSPF's non-preemptive DR election. This is associated with is-is dis election on lan, where a higher-priority IS-IS router is introduced and the pseudonode role changes. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The explanation must account for this protocol behavior.
B:An IS-IS overload bit signals other routers to avoid using that node as transit during SPF. This is associated with is-is overload-bit transit suppression, where a restarting IS-IS router has reachability to itself but should not be used as transit temporarily. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The explanation must account for this protocol behavior.
D:IS-IS CSNP and PSNP messages coordinate completeness and repair missing LSP information. This is associated with is-is csnp and psnp synchronization, where a point-to-point IS-IS link comes up but the peers have inconsistent link-state databases. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The explanation must account for this protocol behavior.
Question 228
During an enterprise data center failover test, the engineering team observes that an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. Use the observed protocol behavior and avoid unrelated configuration changes. Which additional observation most decisively confirms the suspected mechanism?
- A newly flooded LSP precedes a changed shortest-path tree and route selection
- The device has Level-1 reachability and an attached Level-1-2 router rather than full remote-area detail
- The two NET area portions differ even though transport interfaces are reachable
- New IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional
Explanation
Correct Answer
D:New IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. That observation links the reported symptom to IS-IS extends protocol information through TLVs, including support for additional network-layer reachability, rather than to a different routing or access-control fault.
Incorrect Answers
A:A newly flooded LSP precedes a changed shortest-path tree and route selection. This is associated with is-is spf and lsdb changes, where a link-state change causes an IS-IS router to recalculate selected paths. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The confirming observation must discriminate this cause.
B:The device has Level-1 reachability and an attached Level-1-2 router rather than full remote-area detail. This is associated with is-is level-1 area boundary, where a Level-1-only router cannot learn every remote-area prefix directly. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The confirming observation must discriminate this cause.
C:The two NET area portions differ even though transport interfaces are reachable. This is associated with is-is net area compatibility, where directly connected IS-IS Level-1 peers do not establish an adjacency after NET changes. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The confirming observation must discriminate this cause.
Question 229
During a warehouse connectivity rollout, the engineering team observes that an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. Use the observed protocol behavior and avoid unrelated configuration changes. After the findings are confirmed, which targeted change or operational response is most appropriate?
- Enable the necessary IPv6 IS-IS capability and relevant reachability TLVs
- Enable the intended compatible Level-2 adjacency on the inter-area link
- Accept the valid re-election and repair only unintended priority configuration
- Clear the overload condition only after the node's control-plane database is ready
Explanation
Correct Answer
A:Enable the necessary IPv6 IS-IS capability and relevant reachability TLVs. The proposed correction addresses the identified cause: IS-IS extends protocol information through TLVs, including support for additional network-layer reachability. Confirm the associated evidence afterward.
Incorrect Answers
B:Enable the intended compatible Level-2 adjacency on the inter-area link. This is associated with is-is level-2 adjacency between areas, where two IS-IS routers in different areas need backbone reachability but Level-1 formation fails. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The correction should repair this specific failing component.
C:Accept the valid re-election and repair only unintended priority configuration. This is associated with is-is dis election on lan, where a higher-priority IS-IS router is introduced and the pseudonode role changes. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The correction should repair this specific failing component.
D:Clear the overload condition only after the node's control-plane database is ready. This is associated with is-is overload-bit transit suppression, where a restarting IS-IS router has reachability to itself but should not be used as transit temporarily. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The correction should repair this specific failing component.
Question 230
During a remote-office migration, the engineering team observes that an IPv6 capability is added to an existing IS-IS routing domain without changing the underlying link protocol. Use the observed protocol behavior and avoid unrelated configuration changes. Which operational practice would best prevent recurrence or avoid misinterpreting this behavior?
- Verify IS-IS LSDB synchronization as part of point-to-point adjacency acceptance
- Audit device TLV support when extending routing protocol features
- Monitor LSP churn and SPF frequency after topology modifications
- Verify area exit reachability when deploying Level-1 domains
Explanation
Correct Answer
B:Audit device TLV support when extending routing protocol features. The proposed safeguard targets recurrence of IS-IS TLV extensibility by checking the dependency described in the incident.
Incorrect Answers
A:Verify IS-IS LSDB synchronization as part of point-to-point adjacency acceptance. This is associated with is-is csnp and psnp synchronization, where a point-to-point IS-IS link comes up but the peers have inconsistent link-state databases. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The preventive control should monitor the relevant dependency.
C:Monitor LSP churn and SPF frequency after topology modifications. This is associated with is-is spf and lsdb changes, where a link-state change causes an IS-IS router to recalculate selected paths. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The preventive control should monitor the relevant dependency.
D:Verify area exit reachability when deploying Level-1 domains. This is associated with is-is level-1 area boundary, where a Level-1-only router cannot learn every remote-area prefix directly. Here the report is about is-is tlv extensibility; the differentiator is that new IPv6 reachability TLVs appear while existing IS-IS adjacencies remain functional. The preventive control should monitor the relevant dependency.
HCIP-Datacom-Core Technology V1.0 (H12-821) Practice Tests