Question 760
A maintenance window requires detaching a failed uplink without breaking management or workload connectivity. Which administrator action BEST addresses the stated situation?
Explanation
Correct Answer
Configure distributed port group uplink teaming and failover policies aligned to the physical network design is the focused response to this situation: A maintenance window requires detaching a failed uplink without breaking management or workload connectivity. The prerequisite is to verify uplink mappings, physical switch redundancy, and health of each active path before failover testing. Verify the result by checking that traffic remains available during a planned eligible uplink failure and effective teaming matches design.
Incorrect Answers
Although this could be sensible for An ESX host requires dedicated VMkernel functions for management, vMotion, and storage traffic, it is not the directly applicable action here. The present condition (A maintenance window requires detaching a failed uplink without breaking management or workload connectivity) calls for Configure distributed port group uplink teaming and failover policies aligned to the physical network design, with a success criterion of Traffic remains available during a planned eligible uplink failure and effective teaming matches design.
This option would apply to another scenario: A set of virtual machines must attach to a specific segmented application VLAN after live migration. For the present case (A maintenance window requires detaching a failed uplink without breaking management or workload connectivity), it does not address the specific VMware condition. The appropriate action is Configure distributed port group uplink teaming and failover policies aligned to the physical network design; the relevant failure sign is Traffic is blackholed when a failed uplink has no usable standby path or VLAN reachability.
The alternative concerns A vSphere administrator must decide whether separate standard switches or a centrally managed distributed switch fits a cluster, which has different prerequisites. The current case is A maintenance window requires detaching a failed uplink without breaking management or workload connectivity, where the expected outcome is Traffic remains available during a planned eligible uplink failure and effective teaming matches design. This option therefore does not establish the requested action.