AZ-305 Premium Bundle

$79.99

Microsoft AZ-305 Premium Bundle

AZ-305 Premium File: 382 Questions & Answers

Last Update: Oct 14, 2026

AZ-305 Training Course: 87 Video Lectures

AZ-305 PDF Study Guide: 933 Pages

AZ-305 Bundle gives you unlimited access to "AZ-305" files. However, this does not replace the need for a .vce exam simulator. To download VCE exam simulator click here
Microsoft AZ-305 Premium Bundle
Microsoft AZ-305 Premium Bundle

AZ-305 Premium File: 382 Questions & Answers

Last Update: Oct 14, 2026

AZ-305 Training Course: 87 Video Lectures

AZ-305 PDF Study Guide: 933 Pages

$79.99

AZ-305 Bundle gives you unlimited access to "AZ-305" files. However, this does not replace the need for a .vce exam simulator. To download your .vce exam simulator click here

Microsoft AZ-305 Practice Test 36

Question 350

An architect proposes this change: Use Azure Database Migration Service with supported online/offline workflow after assessing compatibility and prerequisites. The workload context is: An application team wants a transparent route to move SQL Server databases from on-premises to Azure with minimal downtime and structured assessment. Which evidence would most directly validate the change?

  1. Run a representative migration, reconcile rows and test application cutover within the allowed interruption.
  2. Deploy a compatibility test and verify built-in backup and managed database operations without VM administration.
  3. Run a cutover rehearsal including cross-database queries, jobs and external connection strings.
  4. Validate required instance-level features and connection behavior from the target VNet.

Explanation

Correct Answer

A:

This observation directly verifies the intended design: Run a representative migration, reconcile rows and test application cutover within the allowed interruption. The architecture being tested is: Use Azure Database Migration Service with supported online/offline workflow after assessing compatibility and prerequisites. The original symptom was: A large database cutover exceeds downtime when operators use one manual full backup restore.

Incorrect Answers

B:

That observation pertains to a separate failure: The company continues to patch an entire Windows Server VM for a small database workload. Its cause is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. It does not confirm the result of this design. The direct proof would be: Run a representative migration, reconcile rows and test application cutover within the allowed interruption.

C:

The alternative test targets: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan. The scenario's actual proposed remedy is: Use Azure Database Migration Service with supported online/offline workflow after assessing compatibility and prerequisites. Verify that one by: Run a representative migration, reconcile rows and test application cutover within the allowed interruption.

D:

This check validates a different workload: Validate required instance-level features and connection behavior from the target VNet. Its associated design is: Use Azure SQL Managed Instance where SQL Server instance compatibility requirements exceed Azure SQL Database capabilities. The required acceptance test here is: Run a representative migration, reconcile rows and test application cutover within the allowed interruption.

Question 351

During architecture troubleshooting, a team reports: A large database cutover exceeds downtime when operators use one manual full backup restore. Context: An application team wants a transparent route to move SQL Server databases from on-premises to Azure with minimal downtime and structured assessment. Which underlying design mistake explains the observed behavior most precisely?

  1. Migration scope ignores instance-level dependencies and target service compatibility.
  2. A single managed database model was selected despite the application's SQL Server instance feature requirements.
  3. The migration process lacks supported continuous data movement or planned downtime strategy.
  4. An IaaS SQL VM was selected even though no host-level SQL Server feature requires it.

Explanation

Correct Answer

C:

The recorded behavior follows from: The migration process lacks supported continuous data movement or planned downtime strategy. The appropriate mitigation would be: Use Azure Database Migration Service with supported online/offline workflow after assessing compatibility and prerequisites. Verify with: Run a representative migration, reconcile rows and test application cutover within the allowed interruption.

Incorrect Answers

A:

This cause would explain a different symptom: Each database is migrated in isolation and dependent cross-database workflows fail in production. The mechanism for that event is: Migration scope ignores instance-level dependencies and target service compatibility. Here the stated symptom is: A large database cutover exceeds downtime when operators use one manual full backup restore. Its cause is: The migration process lacks supported continuous data movement or planned downtime strategy.

B:

The proposed diagnosis fits another scenario: A single managed database model was selected despite the application's SQL Server instance feature requirements. It would typically be reflected by: A migration to Azure SQL Database fails due to unsupported instance-level application dependencies. The current evidence instead supports: The migration process lacks supported continuous data movement or planned downtime strategy.

D:

This cause would explain a different symptom: The company continues to patch an entire Windows Server VM for a small database workload. The mechanism for that event is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. Here the stated symptom is: A large database cutover exceeds downtime when operators use one manual full backup restore. Its cause is: The migration process lacks supported continuous data movement or planned downtime strategy.

Question 352

The design change is: Use Azure Database Migration Service with supported online/offline workflow after assessing compatibility and prerequisites. The original failure was: A large database cutover exceeds downtime when operators use one manual full backup restore. Which ongoing control best prevents recurrence of the same root cause?

  1. Track Managed Instance version compatibility and validate legacy SQL features after migrations.
  2. Reassess database compatibility and PaaS feature availability before expanding server fleets.
  3. Rehearse database migration, rollback and data reconciliation on each application wave.
  4. Maintain inventory of SQL Agent jobs, linked server needs and service endpoint changes.

Explanation

Correct Answer

C:

The key follow-up control is: Rehearse database migration, rollback and data reconciliation on each application wave. It avoids recurrence of the scenario in which: A large database cutover exceeds downtime when operators use one manual full backup restore. It addresses: The migration process lacks supported continuous data movement or planned downtime strategy.

Incorrect Answers

A:

That safeguard manages another risk: A single managed database model was selected despite the application's SQL Server instance feature requirements. Its scenario is: A migration to Azure SQL Database fails due to unsupported instance-level application dependencies. The present recurring risk is: The migration process lacks supported continuous data movement or planned downtime strategy. The proper ongoing control is: Rehearse database migration, rollback and data reconciliation on each application wave.

B:

This is a reasonable safeguard for a different fault: The company continues to patch an entire Windows Server VM for a small database workload. That different mechanism is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. The original incident here instead arises from: The migration process lacks supported continuous data movement or planned downtime strategy. The directly relevant safeguard is: Rehearse database migration, rollback and data reconciliation on each application wave.

D:

That safeguard manages another risk: Migration scope ignores instance-level dependencies and target service compatibility. Its scenario is: Each database is migrated in isolation and dependent cross-database workflows fail in production. The present recurring risk is: The migration process lacks supported continuous data movement or planned downtime strategy. The proper ongoing control is: Rehearse database migration, rollback and data reconciliation on each application wave.

Question 353

A design workshop has this requirement: A MySQL application currently uses a VM and needs managed backups, patching and scaling with familiar MySQL engine semantics. Operators currently observe: The operations team continues maintaining guest OS and database patch processes for a conventional MySQL service. Select the ONE design remedy that best addresses the root cause.

  1. Choose Azure SQL Database when its managed single-database compatibility meets workload requirements.
  2. Enable supported zone-redundant high availability for PostgreSQL flexible server and test managed failover.
  3. Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility.
  4. Choose the supported private networking architecture for PostgreSQL flexible server with correct private DNS and access controls.

Explanation

Correct Answer

C:

This option addresses the actual design defect: A self-managed VM was retained where a compatible managed MySQL service can remove host burden. The correction is: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility. Confirm the outcome with: Validate client queries, backup configuration and instance scaling under representative workload.

Incorrect Answers

A:

This choice mitigates an alternative scenario, where: The company continues to patch an entire Windows Server VM for a small database workload. The underlying issue there is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. Here the root issue is: A self-managed VM was retained where a compatible managed MySQL service can remove host burden. Choose the corresponding action: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility.

B:

The option belongs to a different failure mechanism: High availability was not deployed across suitable availability zones. That situation exhibits: The database is unavailable until a single-zone host is restored after a zonal incident. For the stated case, the remedy is: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility.

D:

This choice mitigates an alternative scenario, where: The database accepts connections over an unrestricted public endpoint. The underlying issue there is: The network exposure model does not enforce the required private access boundary. Here the root issue is: A self-managed VM was retained where a compatible managed MySQL service can remove host burden. Choose the corresponding action: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility.

Question 354

The planned architecture is: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility. Workload context: A MySQL application currently uses a VM and needs managed backups, patching and scaling with familiar MySQL engine semantics. Which acceptance test demonstrates that the required behavior works?

  1. Deploy a compatibility test and verify built-in backup and managed database operations without VM administration.
  2. Observe replica/failover status and successful reconnect after a controlled zone failure scenario.
  3. Validate client queries, backup configuration and instance scaling under representative workload.
  4. Resolve the server FQDN privately and connect from the designated subnet while an external host cannot.

Explanation

Correct Answer

C:

This observation directly verifies the intended design: Validate client queries, backup configuration and instance scaling under representative workload. The architecture being tested is: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility. The original symptom was: The operations team continues maintaining guest OS and database patch processes for a conventional MySQL service.

Incorrect Answers

A:

That observation pertains to a separate failure: The company continues to patch an entire Windows Server VM for a small database workload. Its cause is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. It does not confirm the result of this design. The direct proof would be: Validate client queries, backup configuration and instance scaling under representative workload.

B:

The alternative test targets: Enable supported zone-redundant high availability for PostgreSQL flexible server and test managed failover. The scenario's actual proposed remedy is: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility. Verify that one by: Validate client queries, backup configuration and instance scaling under representative workload.

D:

That observation pertains to a separate failure: The database accepts connections over an unrestricted public endpoint. Its cause is: The network exposure model does not enforce the required private access boundary. It does not confirm the result of this design. The direct proof would be: Validate client queries, backup configuration and instance scaling under representative workload.

Question 355

The customer states: A MySQL application currently uses a VM and needs managed backups, patching and scaling with familiar MySQL engine semantics. An incident reveals: The operations team continues maintaining guest OS and database patch processes for a conventional MySQL service. What cause best accounts for this evidence?

  1. The network exposure model does not enforce the required private access boundary.
  2. An IaaS SQL VM was selected even though no host-level SQL Server feature requires it.
  3. High availability was not deployed across suitable availability zones.
  4. A self-managed VM was retained where a compatible managed MySQL service can remove host burden.

Explanation

Correct Answer

D:

This is the failure mechanism rather than an incidental symptom: A self-managed VM was retained where a compatible managed MySQL service can remove host burden. It accounts for: The operations team continues maintaining guest OS and database patch processes for a conventional MySQL service. The architectural repair is: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility.

Incorrect Answers

A:

The proposed diagnosis fits another scenario: The network exposure model does not enforce the required private access boundary. It would typically be reflected by: The database accepts connections over an unrestricted public endpoint. The current evidence instead supports: A self-managed VM was retained where a compatible managed MySQL service can remove host burden.

B:

The alternative weakness is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. Its associated failure is: The company continues to patch an entire Windows Server VM for a small database workload. Neither explains the present observation: The operations team continues maintaining guest OS and database patch processes for a conventional MySQL service. The direct cause here is: A self-managed VM was retained where a compatible managed MySQL service can remove host burden.

C:

This cause would explain a different symptom: The database is unavailable until a single-zone host is restored after a zonal incident. The mechanism for that event is: High availability was not deployed across suitable availability zones. Here the stated symptom is: The operations team continues maintaining guest OS and database patch processes for a conventional MySQL service. Its cause is: A self-managed VM was retained where a compatible managed MySQL service can remove host burden.

Question 356

Workload context: A MySQL application currently uses a VM and needs managed backups, patching and scaling with familiar MySQL engine semantics. The implemented remedy is: Select Azure Database for MySQL Flexible Server after confirming required version and feature compatibility. Which ongoing practice most specifically prevents recurrence of this failure: The operations team continues maintaining guest OS and database patch processes for a conventional MySQL service.?

  1. Audit DNS linkage, firewall/network rules and supported networking mode before redeployment.
  2. Reassess database compatibility and PaaS feature availability before expanding server fleets.
  3. Monitor standby health and connection retry patterns after server maintenance.
  4. Review engine-version upgrade and high availability support before migration windows.

Explanation

Correct Answer

D:

This is an ongoing protection specific to the fault: Review engine-version upgrade and high availability support before migration windows. The recurrence risk is: A self-managed VM was retained where a compatible managed MySQL service can remove host burden. It should be checked using: Validate client queries, backup configuration and instance scaling under representative workload.

Incorrect Answers

A:

This is a reasonable safeguard for a different fault: The database accepts connections over an unrestricted public endpoint. That different mechanism is: The network exposure model does not enforce the required private access boundary. The original incident here instead arises from: A self-managed VM was retained where a compatible managed MySQL service can remove host burden. The directly relevant safeguard is: Review engine-version upgrade and high availability support before migration windows.

B:

The proposed control focuses on: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. For the design in the question, recurrence comes from: A self-managed VM was retained where a compatible managed MySQL service can remove host burden. A precise prevention step is: Review engine-version upgrade and high availability support before migration windows.

C:

That safeguard manages another risk: High availability was not deployed across suitable availability zones. Its scenario is: The database is unavailable until a single-zone host is restored after a zonal incident. The present recurring risk is: A self-managed VM was retained where a compatible managed MySQL service can remove host burden. The proper ongoing control is: Review engine-version upgrade and high availability support before migration windows.

Question 357

A solution architect is reviewing a workload: A SQL Server architecture uses several on-prem SQL databases with transactional coupling and wants predictable cutover to Azure SQL Managed Instance. The observed incident is: Each database is migrated in isolation and dependent cross-database workflows fail in production. Which architecture choice most directly removes the identified weakness?

  1. Configure an Azure SQL failover group with appropriate primary/secondary databases and supported read-write listener usage.
  2. Choose Azure SQL Database when its managed single-database compatibility meets workload requirements.
  3. Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.
  4. Use Azure SQL Managed Instance where SQL Server instance compatibility requirements exceed Azure SQL Database capabilities.

Explanation

Correct Answer

C:

The evidence (Each database is migrated in isolation and dependent cross-database workflows fail in production.) identifies the following cause: Migration scope ignores instance-level dependencies and target service compatibility. The design that removes it is: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan. The acceptance check is: Run a cutover rehearsal including cross-database queries, jobs and external connection strings.

Incorrect Answers

A:

The option belongs to a different failure mechanism: The application is coupled to a fixed server endpoint instead of the failover-group listener. That situation exhibits: Clients cannot connect after manual regional failover because they use a region-specific server hostname. For the stated case, the remedy is: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.

B:

That design instead addresses another observed condition: The company continues to patch an entire Windows Server VM for a small database workload. Its technical cause is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. The current workload exhibits: Each database is migrated in isolation and dependent cross-database workflows fail in production. Its targeted remedy is: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.

D:

The option belongs to a different failure mechanism: A single managed database model was selected despite the application's SQL Server instance feature requirements. That situation exhibits: A migration to Azure SQL Database fails due to unsupported instance-level application dependencies. For the stated case, the remedy is: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.

Question 358

An architect proposes this change: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan. The workload context is: A SQL Server architecture uses several on-prem SQL databases with transactional coupling and wants predictable cutover to Azure SQL Managed Instance. Which evidence would most directly validate the change?

  1. Initiate planned failover and test connection string continuity through the failover-group listener.
  2. Validate required instance-level features and connection behavior from the target VNet.
  3. Deploy a compatibility test and verify built-in backup and managed database operations without VM administration.
  4. Run a cutover rehearsal including cross-database queries, jobs and external connection strings.

Explanation

Correct Answer

D:

The decisive evidence is: Run a cutover rehearsal including cross-database queries, jobs and external connection strings. This measures the mechanism of the planned change, not an unrelated Azure service: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.

Incorrect Answers

A:

The alternative test targets: Configure an Azure SQL failover group with appropriate primary/secondary databases and supported read-write listener usage. The scenario's actual proposed remedy is: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan. Verify that one by: Run a cutover rehearsal including cross-database queries, jobs and external connection strings.

B:

This check validates a different workload: Validate required instance-level features and connection behavior from the target VNet. Its associated design is: Use Azure SQL Managed Instance where SQL Server instance compatibility requirements exceed Azure SQL Database capabilities. The required acceptance test here is: Run a cutover rehearsal including cross-database queries, jobs and external connection strings.

C:

That observation pertains to a separate failure: The company continues to patch an entire Windows Server VM for a small database workload. Its cause is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. It does not confirm the result of this design. The direct proof would be: Run a cutover rehearsal including cross-database queries, jobs and external connection strings.

Question 359

During architecture troubleshooting, a team reports: Each database is migrated in isolation and dependent cross-database workflows fail in production. Context: A SQL Server architecture uses several on-prem SQL databases with transactional coupling and wants predictable cutover to Azure SQL Managed Instance. Which underlying design mistake explains the observed behavior most precisely?

  1. The application is coupled to a fixed server endpoint instead of the failover-group listener.
  2. A single managed database model was selected despite the application's SQL Server instance feature requirements.
  3. Migration scope ignores instance-level dependencies and target service compatibility.
  4. An IaaS SQL VM was selected even though no host-level SQL Server feature requires it.

Explanation

Correct Answer

C:

This is the failure mechanism rather than an incidental symptom: Migration scope ignores instance-level dependencies and target service compatibility. It accounts for: Each database is migrated in isolation and dependent cross-database workflows fail in production. The architectural repair is: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.

Incorrect Answers

A:

The alternative weakness is: The application is coupled to a fixed server endpoint instead of the failover-group listener. Its associated failure is: Clients cannot connect after manual regional failover because they use a region-specific server hostname. Neither explains the present observation: Each database is migrated in isolation and dependent cross-database workflows fail in production. The direct cause here is: Migration scope ignores instance-level dependencies and target service compatibility.

B:

This cause would explain a different symptom: A migration to Azure SQL Database fails due to unsupported instance-level application dependencies. The mechanism for that event is: A single managed database model was selected despite the application's SQL Server instance feature requirements. Here the stated symptom is: Each database is migrated in isolation and dependent cross-database workflows fail in production. Its cause is: Migration scope ignores instance-level dependencies and target service compatibility.

D:

The alternative weakness is: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. Its associated failure is: The company continues to patch an entire Windows Server VM for a small database workload. Neither explains the present observation: Each database is migrated in isolation and dependent cross-database workflows fail in production. The direct cause here is: Migration scope ignores instance-level dependencies and target service compatibility.

Question 360

A design review identifies: A SQL Server architecture uses several on-prem SQL databases with transactional coupling and wants predictable cutover to Azure SQL Managed Instance. The failure is: Each database is migrated in isolation and dependent cross-database workflows fail in production. Select TWO distinct decisions that together provide the immediate technical solution AND an ongoing prevention control. A verification-only step does not replace either responsibility.

  1. Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.
  2. Use Azure SQL Managed Instance where SQL Server instance compatibility requirements exceed Azure SQL Database capabilities.
  3. Use Azure Database Migration Service with supported online/offline workflow after assessing compatibility and prerequisites.
  4. Maintain inventory of SQL Agent jobs, linked server needs and service endpoint changes.
  5. Reassess database compatibility and PaaS feature availability before expanding server fleets.

Explanation

Correct Answers

A:

The targeted implementation is: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan. The problem is not generic resource availability: Migration scope ignores instance-level dependencies and target service compatibility. Verify the result by: Run a cutover rehearsal including cross-database queries, jobs and external connection strings.

D:

The key follow-up control is: Maintain inventory of SQL Agent jobs, linked server needs and service endpoint changes. It avoids recurrence of the scenario in which: Each database is migrated in isolation and dependent cross-database workflows fail in production. It addresses: Migration scope ignores instance-level dependencies and target service compatibility.

Incorrect Answers

B:

That design instead addresses another observed condition: A migration to Azure SQL Database fails due to unsupported instance-level application dependencies. Its technical cause is: A single managed database model was selected despite the application's SQL Server instance feature requirements. The current workload exhibits: Each database is migrated in isolation and dependent cross-database workflows fail in production. Its targeted remedy is: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.

C:

This choice mitigates an alternative scenario, where: A large database cutover exceeds downtime when operators use one manual full backup restore. The underlying issue there is: The migration process lacks supported continuous data movement or planned downtime strategy. Here the root issue is: Migration scope ignores instance-level dependencies and target service compatibility. Choose the corresponding action: Design a compatibility-tested migration with appropriate instance sizing, connectivity, application dependencies and rollback plan.

E:

That safeguard manages another risk: An IaaS SQL VM was selected even though no host-level SQL Server feature requires it. Its scenario is: The company continues to patch an entire Windows Server VM for a small database workload. The present recurring risk is: Migration scope ignores instance-level dependencies and target service compatibility. The proper ongoing control is: Maintain inventory of SQL Agent jobs, linked server needs and service endpoint changes.


Designing Microsoft Azure Infrastructure Solutions (AZ-305) Practice Tests

Purchase Individually

AZ-305 Premium File

Premium File
AZ-305 Premium File
382 Q&A
$76.99$69.99

AZ-305 Training Video Course

Training Course
AZ-305 Training Video Course
87 Lectures
$27.49$24.99

AZ-305 Study Guide

Study Guide
AZ-305 Study Guide
933 PDF Pages
$27.49$24.99

Site Search:

 

VISA, MasterCard, AmericanExpress, UnionPay

SPECIAL OFFER: GET 10% OFF

ExamCollection Premium

ExamCollection Premium Files

Pass your Exam with ExamCollection's PREMIUM files!

  • ExamCollection Certified Safe Files
  • Guaranteed to have ACTUAL Exam Questions
  • Up-to-Date Exam Study Material - Verified by Experts
  • Instant Downloads
Enter Your Email Address to Receive Your 10% Off Discount Code
A Confirmation Link will be sent to this email address to verify your login
We value your privacy. We will not rent or sell your email address

SPECIAL OFFER: GET 10% OFF

Use Discount Code:

MIN10OFF

A confirmation link was sent to your e-mail.
Please check your mailbox for a message from support@examcollection.com and follow the directions.

Next

Download Free Demo of VCE Exam Simulator

Experience Avanset VCE Exam Simulator for yourself.

Simply submit your e-mail address below to get started with our interactive software demo of your free trial.

Free Demo Limits: In the demo version you will be able to access only first 5 questions from exam.