Question 80
An assessment standards group at Glenrock Pharmaceutical Plant wants to prevent recurrence of: An equipment supplier and asset owner each expect the other to validate access-control logs for a shared maintenance server. Which lasting control belongs in its process?
Explanation
Correct Answer
In the assessment at Glenrock Pharmaceutical Plant, the decisive observed condition is: An equipment supplier and asset owner each expect the other to validate access-control logs for a shared maintenance server. The responsible mechanism is: Assessment preparation has no accountable owner for collecting evidence at a supplier-operated boundary. An appropriately focused correction is: Assign an evidence owner and control responsibility for every third-party connection in the scope register. The checkable acceptance evidence is: The assessment plan identifies who supplies and verifies access configurations, logs and remediation decisions.
Incorrect Answers
This prevention response addresses another preparing for an assessment situation: An isolated interlock PLC is assumed cyber-irrelevant despite programmable maintenance-port access and direct process authority. That situation has the distinct causal mechanism: The initial scope equated absence of routine Ethernet traffic with absence of cyber-physical exposure. The present case instead turns on: Assessment preparation has no accountable owner for collecting evidence at a supplier-operated boundary.
This prevention response addresses another preparing for an assessment situation: A service technician identifies an enabled telephone-line modem connected to a legacy RTU despite a declared no-external-access design. That situation has the distinct causal mechanism: The asset-discovery process did not capture an out-of-band remote entry path. The present case instead turns on: Assessment preparation has no accountable owner for collecting evidence at a supplier-operated boundary.
This prevention response addresses another preparing for an assessment situation: An integrator's startup laptop subnet has persistent reachability to production PLCs yet does not appear in the completed assessment boundary. That situation has the distinct causal mechanism: The assessment excludes a temporary segment without confirming its operational isolation or retirement. The present case instead turns on: Assessment preparation has no accountable owner for collecting evidence at a supplier-operated boundary.