Question 930
An OT risk owner is ready to close the follow-up after: A substation receives DNP3 control operations from an engineering laptop that should only observe measurements. Which evidence-and-prevention pairing best demonstrates both repair and recurrence control?
Explanation
Correct Answer
The measured result is: Unapproved control operations are denied while measurement polling continues from the allowed hosts. The preventive follow-up is: Validate permitted DNP3 masters and control functions in substation security reviews. Together they establish a durable response to: DNP3 operations from an unapproved master are permitted by the current industrial firewall policy.
Incorrect Answers
This evidence and prevention would close a different problem: An engineer inserted a broad accept rule above the inspected OT conduit, and industrial packets now bypass the specialized IPS profile. The required current recovery evidence is: Unapproved control operations are denied while measurement polling continues from the allowed hosts.
The proposed closure would be relevant to another incident: An unexpected industrial read query traverses the allowed conduit but leaves no FortiGate record for forensic correlation. It does not demonstrate that the present cause is controlled: DNP3 operations from an unapproved master are permitted by the current industrial firewall policy.
That closure addresses a separate dependency: A FortiGate installed in a disconnected plant still uses an outdated industrial IPS signature package months after its approved update schedule. The correct preventive control here is: Validate permitted DNP3 masters and control functions in substation security reviews.