Question 790
An OT maintenance change was applied after this failure: An old industrial endpoint reports CRC errors and retransmissions after an unmanaged media converter is replaced. Which measured result most directly confirms the fault has been corrected?
Explanation
Correct Answer
The observed outcome directly proves the target state: Link errors stop growing and the process data exchange returns to its normal cadence. The change responsible for this result is: Align the supported port speed and duplex settings without forcing an unsupported mode on the PLC.
Incorrect Answers
The alternative result concerns: Two production cells intended to be separate receive the same VLAN ID across an uplink, and broadcast packets appear in both cells. Required proof here: Link errors stop growing and the process data exchange returns to its normal cadence.
The proposed result would show recovery from a different incident: A new packaging PLC can reach the local switch but not the designated supervisory subnet after its port was reconfigured as a trunk. It does not prove the required outcome: Link errors stop growing and the process data exchange returns to its normal cadence.
That evidence corresponds to another change: Video multicast from a maintenance network congests an unrelated safety-system switch segment. The current case needs the specific acceptance result: Link errors stop growing and the process data exchange returns to its normal cadence.