Question 740
An architecture reviewer evaluates this OT failure: An OT security risk dashboard ranks a patched historian as high risk and omits an unpatched PLC introduced last week. Which technical or operational design principle best governs the corrective plan?
Explanation
Correct Answer
This design rule explains the necessary security behavior: Risk prioritization depends on current exposure and impact, not only a historical scan result. The reported failure mechanism is: The assessment relies on stale asset firmware and vulnerability data rather than current observations.
Incorrect Answers
This general OT principle addresses a different constraint: A FortiAnalyzer OT Security Risk report covers one factory but ignores a newly acquired production site. It does not account for the cause: The assessment relies on stale asset firmware and vulnerability data rather than current observations.
That principle is pertinent when: A FortiGuard advisory raises a high priority for a device model that the plant does not deploy, pushing real exposures down the queue. The reported situation is governed by the different rule: Risk prioritization depends on current exposure and impact, not only a historical scan result.
The proposed rule applies to another design problem: A vulnerability tool scores a controller as low priority because it lacks sensitive business data, despite its direct safety role. The principle that explains this case is: Risk prioritization depends on current exposure and impact, not only a historical scan result.



Fortinet NSE 6 - OT Security 7.6 Architect (NSE6_OTS_AR-7.6) Practice Tests