Question 220
The SIEM release owner needs an evidence-based closeout for this corrected incident: A new ingestion design allocates barely enough memory for the operating system while configuring several in-memory queues. Which record set should be retained before the work is declared complete?
Explanation
Correct Answer
For the reported case—a new ingestion design allocates barely enough memory for the operating system while configuring several in-memory queues—the cause is that the deployment memory budget does not include concurrent sink buffers and collector process overhead. The acceptance evidence must show that the collector handles configured buffers without memory exhaustion or forced restart.
Incorrect Answers
This is investigation evidence, not proof that the reported issue has been corrected and tested: a new ingestion design allocates barely enough memory for the operating system while configuring several in-memory queues.
The recurring safeguard is useful, but it cannot replace direct evidence that this reported issue was resolved: a new ingestion design allocates barely enough memory for the operating system while configuring several in-memory queues.
This is evidence for a separate problem: A collector host becomes overloaded whenever a firewall emits its expected daily peak of events. It does not establish closure for the current case: A new ingestion design allocates barely enough memory for the operating system while configuring several in-memory queues.



CrowdStrike Certified SIEM Engineer (CCSE) Practice Tests