Question 30
Two Bedrock foundation models have very different parameter counts. The proposed procurement decision is based only on which has more parameters. What evaluation is needed?
Explanation
Correct Answer
Parameter count does not directly rank accuracy, cost or latency on a particular workload. A comparable evaluation population and regional/model constraints determine feasibility and business utility.
Incorrect Answers
Size is not evidence of superior task accuracy or an acceptable latency/cost envelope.
Changing evaluation inputs confounds the comparison and hides accuracy, throughput and completion-cost differences.
Catalog breadth does not demonstrate whether either candidate meets the application acceptance thresholds.



AWS Certified Generative AI Developer - Professional AIP-C01 Practice Tests